Case Studies

Here are a few of the projects that we have delivered recently, as you can see they demonstrate a wide variety of specialities.

LesiureCentre

Leisure Centre

This was a £4M Extension, which consisted of a swimming pool, learner pool and new fitness suite. As part of the new two storey construction, we also built a new changing village, café seating area, competitor seating, various plant rooms, a treatment room, extended the car park and the carriageway / roundabout to accommodate for […]

AxiomPM-CaseStudy_RoyalAcademyOfArts

Royal Academy of Arts

The project management of the Lecture Room & Gallery IX internal fabric refurbishment and plant upgrade project at the Royal Academy of Arts in Piccadilly, London, ensuring that the Academy remains open for business during its busiest period. Project has been successfully carried out under extreme logistical, security and operational restrictions set in place due […]

AxiomPM-CaseStudy_BritishLibrary

British Library

The project at the British Library was to supply a new natural gas main supply to serve the existing boiler plant in Building 12 on the campus. Two oil fired boilers were removed and changed to gas fired boilers and additional works were required to modify the existing gas main serving building 31’s boiler plant. […]

BA

British Airways

Coordinating the ongoing high level structural surveys across 23 British Airways operational buildings to determine their general condition and identify any items at risk of deteriorating and falling from height. Post survey, managing the remedial works recommended in the survey reports (such as removing spalling concrete, securing areas of defective timber cladding, and repairing gutters […]

Glasgowrollout

Nuffield Health Hospital Glasgow R22 Roll out

Replace all R22 AHU & AC equipment within a ‘live’ hospital, works included replacing AHU coils supplying air to the theatres and also replacing AC cassette in various specialist rooms and patient rooms. Works also included mechanical & electrical strip out and installation works. Full redecoration to the Theatres and White rock installed throughout. Door […]

Nuffield Health London

Managing a chiller replacement project in a London based gym. Working closely with the client and contractors in order to keep the site impact to a minimum. Complex crane lift, site surveys and validation inspections carried out. Associated BMS upgrades, lagging to all exterior pipe work and Bird netting fitted. Responsible for the full delivery of the […]

CreditSuisse

Credit Suisse

The project involved the replacement of existing air and water cooled chillers in three Credit Suisse buildings in Canary Wharf; One Cabot Square, 17 Columbus Courtyard and 20 Columbus Courtyard including valves, pumps and controls. The Scope of Works generally involved the following: One Cabot Square: Replacing 2 Water Cooled Chillers including Valves. Replacing the 3 […]

Nuffield Health Chester Gym Refurbishment

Renovating two squash courts and old bar area into new offices, squash courts removed and a mezzanine floor installed to erect more treatment/ physio rooms. Works included demolition, structural, mechanical, electrical and IT works.

City-GYM

Nuffield Health Flagship

Overseeing the replacement of 25 Fan Coil Units (chassis type) and 13 Cassette Fan Coil Units along with all HVAC infrastructure services. AHU and Duct work modifications made to enhance the operational capacity of the system. Decoration works to the Bulkhead, New Grilles, Ceiling Tiles and Lighting. And 2 new Pressurisation units installed. This was […]

Greater London Authority

On behalf of the Greater London Authority (GLA) and CBRE, we managed the high profile project “Trafalgar Square Christmas Tree” from its erection at the end of November to its de-rigging on 06th of January, including the Lighting Ceremony involving government officials of UK and Norway. This was a critical project in terms of schedule, […]

Bank of America

We have just finished a 3 floor office fit out for Bank of America for RSE Building Services. We had the full M&E contract to install all electrical services, also replace LV Pan assemblies with new mccbs this required a close monitored weekend shut down of the BOA site. Installation of a new Mitsubishi AC […]

CaseStudy_Santander-Main

Santander – New data centre

In green the new UPS B system that is undergoing commissioning and testing before going live to replace the still live obsolete system. The equipment is connected to new bus bars (also in green) installed throughout the data centre. The next phase on the project is the installation of a new UPS A system to […]

FenchurchStreetMain

HWS Cylinder Replacement for AIG

Project is to replace 2 old, out of date, damaged hot water cylinders and replace with new including a new water softener to help reduce the effects of lime scale. We are currently in week 2 of a 3 week project. We have replaced one cylinder. The new cylinder has been pressure tested and is […]

EE_Roof_Main

Atrium Re-Roofing Works, EE Building

Works were recently completed to the flat roof of an atrium connecting two large office buildings. The project was undertaken utilising the Sarnafil flat roof system to cover an approximate area of 90m x 3m flat roof with upstand on both sides, guttering and 10no. air vents. The project also consisted of the installation of […]

CaseStudy_TheatreRemedial_works

Theatre Remedial works

A four week project to upgrade three theatres with whiterock wall cladding and new vinyl flooring to improve the hospital’s infection prevention. The project also included works to upgrade some corridors and ancillary theatre rooms, as well as works to maintain and validate the various ventilation systems including PRDs (Pressure Relief Damper) into the theatres.  […]

FlightSimulator2-CaseStudy

Flight Simulator

Principal Contractor delivering multi million pound flight training equipment at a London Airport. Managing the migration of 13 Flight Simulators to the clients new Simulator Hall at their Operations Base Heathrow and taking the role as Principal Contractor. Working closely with the client’s American flight simulator specialist and co-ordinating a fast track Mechanical and electrical programme which could not slip due […]

GlassReplacement-CaseStudy1

Glass replacement

Project managing the replacement of 1700 high level panes of glass. The replacement of only 10% of the hangar roofs 1740 glazing panels took over a year to complete working at high level, variable weather conditions with it’s success relying communicating with engineering and aircraft personnel coordinating glazing works with aircraft and personnel moment.

BoilerReplacement-CaseStudy

Boiler Replacement

Upgrade of Gas Mains Incoming Supply & Biomass Boiler installation. Successfully project managed the installation of a biomass boiler and upgrade of the incoming mains gas line. The project involved asbestos removal, night-work traffic management in the centre of a large town, demolition and building works.

HWS Cylinder Replacement for AIG

Chiller replacement project; Canary Wharf: The project involves the replacement air and water cooled chillers in three buildings in Canary Wharf. Replacing water cooled chillers including valves, the chiller condenser water and chilled water pumps and valves with inverter pumps, the air cooled chillers, the chilled water inverter pumps with new inverter pumps and the […]