Works were recently completed to the flat roof of an atrium connecting two large office buildings. The project was undertaken utilising the Sarnafil flat roof system to cover an approximate area of 90m x 3m flat roof with upstand on both sides, guttering and 10no. air vents. The project also consisted of the installation of a non-slip walkway.
A high attention to detail was required to ensure water-tightness particularly around the air vents and guttering.
The project was set-up, mobilised and completed within the project timescale of five weeks, despite several days of inclement weather.
In terms of health and safety, roofing operatives were closely supervised to ensure harnesses and lanyards were worn at all times and clipped on to the Man Safe system in situ on the roof. There were no reportable incidents or accidents during the project.