Santander – New data centre

CaseStudy_Santander-Main

In green the new UPS B system that is undergoing commissioning and testing before going live to replace the still live obsolete system. The equipment is connected to new bus bars (also in green)
installed throughout the data centre. The next phase on the project
is the installation of a new UPS A system to replace the existing obsolete UPS A.

The second picture is for the Chilled Water pipe work to serve the new energy efficient data centre; the picture shows pipe connections external to the data centre serving 5 of the 8 brand new CRAC units (shown in the third picture on the right hand side in black) installed by the main contractor between December and March.

The project will continue in phases until the end of the year with the remaining 50% of the IT cabinets & related data centre infrastructure.